How it Works

How it Works

BUILDING SYSTEM\How it Works

R-ETR0 Ties are fastened to the existing building with screws at 24″ – l5l mml centers.
EPS Panels are fit over the tie flanges and another row of R-ETRO Ties
are placed in the tops of the panels at 24″ to 10 mml. Panels can be easily cut around
openings and protrusions from the building. Finish materials can be applied directly to
the R-ETR0 System or furring strips can be applied to the surface of the panels prior
to finishing.

m2pack.biz