HUMAN RESOURCES FACTORY 3من اصل3

HUMAN RESOURCES FACTORY 3من اصل3

Decorations\HUMAN RESOURCES FACTORY  3من اصل3

The proposed positioning in the compound’s layout for the Academy’s
building allows for the functional requirements of each of the elements and
various activities without prejudice to the required privacy and the
regulatory framework for space on the two main spatial organizations were
based on two main principals:
2.1. The distribution of the different elements of the space program
into functional groups:
Distribution of elements different functional groups each considerations and
needs functional and spatial group includes schools (Machatronics ,
Automotive, Construction, along Future) / administration / classroom
teaching and small workshops / research center and organized all of the
groups on the general elements appropriate and constituent nerve internal
project.
2.2. De-constructing the architectural form
The grouping similar functional spaces and organized in several different
spaces blocks associated with these different blocks composed a series of
interior spaces, which represents the heart of the project and configured to
meet different needs.

m2pack.biz