GREATER CAIRO METRO LINE 3, PHASE 3, EGYPT
Phase three of the Greater Cairo metro line 3 is around 18+ Km,
connecting El-Attaba to Rod El- Farag corridor, passing through Al-Kit kaat
up to Cairo University station of line 2. The phase consists of 15 stations, 8
of which are underground, 2 on-grade, and 5 elevated stations. The
National Authority of Tunnels’ partnership with EHAF will include the
detailed, complete architectural and civil design scopes. EHAF, along with
other French companies, is conducting the PM/CM scope during
construction as well.