Control and optimization upgrade in Egypt  in control  

control and optimization upgrade in egypt in control
control and optimization upgrade in egypt in control

ABB is upgrading the Network 90 distributed control system at the Damanhour power plant in Egypt and integrating it with the burner management and burner combustion systems to provide a single integrated control system for the entire plant.

ABB was awarded the contract by West Delta Electricity Production Company to modernize the existing distributed control system at the 300 MW Damanhour thermal power plant In the western Nile Delta.

By evolving the existing Network 90 control system to Symphony Harmony and integrating it with the Symphony Harmony burner systems ABB will provide a fully integrated automation system based on the same control platform that will improve plant efficiency, availability and safety.

The solution Includes ABB’s Composer Engineering Tools and Power Generation Portal HMI, which provide a complete set of engineering and maintenance tools and an intuitive operating environment from which operations or management personnel can easily and efficiently access plant data.

m2pack.biz