Phases-of-Construction
The proposed science city was designed specifically to allow specific buildings to be
constructed before other parts of the project. Therefore administration, exhibition
halls, orientation hall and observation tower would be built in PHASE 1, while
research center high definition theatre.
workshops and planetarium will be built in PHASE 2 and finally, technical spaces and
conference area will be built in PHASE 3.
Open Staircase
Active body and health by dynamic office environment Green roof Green roof creates
thermal mass for heat reduction
Solar Glass
PV cells in glass on south façade produces energy and retain solar heat Reduce water
consumption Re-use of grey water for toilets, sensor Water taps and double flush
toilets
Daylight control
Shutter system + Design by building orientation
Solar panels
PV cells on roof produces solar energy Sun shading system
Louvre systems as shading for sun and creating architectural expression.
Reduce energy consumption
Use Led and automatic controlled lighting system
Fresh air and greenery
Greenery produces oxygen and create nature environment
Natural ventilation
Ventilation by natural stream of fresh air and overflow by building organization
Acoustics
Greenery and acoustic materials
Climate control
Connection green areas function as Climate controlled atrium through building
Section
Keeping sun heat out and create natural ventilation by airstream through open gree
Temporary Exhibition space
Research Center Hall
Interactive exhibition space
Collections exhibition space
Exterior exhibition space