City Stars Sharm El Sheikh Egypt 1من اصل2
A development comprising of Villas, 8 stories Residential buildings areas, 5
stars crown plaza resorts, beach resort and golf resort. The project includes
a Retail and entertainment area with crystal lagoons, swimming pools/
beach club, an aquarium, Sports facilities and a golf course area. The
project includes also Educational facilities and staff accommodations. The
Total Land area is 7.5 million square meters, total built up area of 6.5
million square meters.
Scope of work:
Complete design of Electrical, Telephone, Water, Sewage, District Cooling
and light Current networks for the Infrastructure of the site.
Detailed design of plumbing, firefighting, electric power supply, lighting and
light current systems for buildings
Giza North- 1500MW Combined Cycle Power Project 500kV & 220kV
Gas Insulated Switchyard
was awarded to the Consortium of Daewoo International Corporation and
Hyundai Heavy Industries Co. Ltd. Manufacturer: The main equipment
(GIS are manufactured by HHI and main transformers are manufactured
by HHI) Client : Control and Instrumentation Systems Technology
(CONISYS)
Year : Under Construction to be commissioned in 2013
Value of Project: 44,91 5,1 34 USD + 1 4,1 46,039 LE
SCG Scope of Work:
– Project management.
– Procurement Services
– Primary design.
– Civil design
– Steel structure design
– Control and protection systems schematic diagrams, cable lists and cables
routing.
-Earthing, lightning protection and AC/DC systems detailed design and
shop drawings
– Construction management and supervision
Mall of Egypt, 6th of October city
The Mall of Egypt is around 230,000 m2 of Built- up Area
including 412 shops, restaurants , cinemas , entertaining facilities in
addition to the first and only Ski Slope in Africa.