NEW CONNE CTION OFFICE BUILDING NCOB 1من اصل2
Design Team: Architectural and Main Consultant: Yasser Mansour Concept
Architects (YMCA) LEED AP: Engineering Solutions (ES)
Structural Consultant: Hilal Consultants
Electrical Consultant: Electrical Studies Office (ESO) Public Health
Consultant: Mito Consult Construction date:
2015-2017
LEED Silver
LEED BD+C: Core and Shell v3 – LEED 2009
NCOB building is LEED Silver certified, certified on Oct.2015 scoring 54
points out of 110 Possible points. The breakdown of the credits is as
follow:
Energy and Atmosphere: 11/37 possible points.
Materials and resources: 4/13 possible points.
Indoor Environmental Quality: 6/20 possible points. Sustainable Sites: 22/
28 possible points.
Water Efficiency: 4/10 possible points.
Innovation in Design: 4/6
a transformer room, an MVDB room, a generator room ,an electric room,
two service rooms, in addition to the vertical circulation elements (2 stairs,
elevator, service elevator) and necessary lobby and corridor spaces. Two
ramps lead to the upper basement level.
?The upper basement (B1) consists of 70 parking spaces, allowing for
a total parking capacity in the project of 206 parking spaces), a
transformer room, an RMU room, a changing room, an electric
control room, an electric room, a service room, awe for drivers, in
addition to the vertical circulation elements (2 stairs, elevator, service
elevator) and necessary lobby and corridor spaces.
?Ground floor level consists of an electric room, a service room, 2 we
areas, storage and service areas in addition to the vertical circulation
elements (2 stairs, elevator, service elevator) and necessary lobby,
corridor spaces and office spaces.
?The typical Floors consist of the office spaces, an electric room, 2 we
areas, 2 service rooms and 1 storage room, in addition to the vertical
circulation elements (2 stairs, elevator, service elevator) and
necessary lobby and corridor spaces.